Home Aircraft manufacturers Countries Publications About & contact
 
 
 
Royal Netherlands Air Force F-35 Lightning II
 
Latest update: July 2020
 
Production batches
 
Prod. Batch Prod. Lot MSN Serial Prod. Plant Roll out First Flight Delivery date Status Squadron
LRIP 3 3 AN-1 F-001 Fort Worth, Texas 01-04-12 06-08-12 25-07-13 Active 323 TES
LRIP 4 4 AN-2 F-002 Fort Worth, Texas 02-03-13 27-06-13 12-09-13 Active 323 TES
LRIP 11 11 AN-3 F-003 Fort Worth, Texas 30-01-19 15-12-18 04-02-19 Active NODF-35 (308th FS)
LRIP 11 11 AN-4 F-004 Fort Worth, Texas   08-01-19 07-02-19 Active NODF-35 (308th FS)
LRIP 11 11 AN-5 F-005 Fort Worth, Texas   23-01-19 19-03-19 Active NODF-35 (308th FS)
LRIP 11 11 AN-6 F-006 Fort Worth, Texas   28-01-19 06-03-19 Active NODF-35 (308th FS)
LRIP 11 11 AN-7 F-007 Fort Worth, Texas   20-02-19 12-03-19 Active NODF-35 (308th FS)
LRIP 11 11 AN-8 F-008 Fort Worth, Texas   15-04-19 10-05-19 Active NODF-35 (308th FS)
LRIP 11 11 AN-9 F-009 Cameri, Italy 12-09-19 09-09-19 31-10-19 Active 322 squadron
LRIP 11 11 AN-10 F-010 Cameri, Italy     16-12-19 Active 322 squadron
LRIP 12 12 AN-11 F-011 Cameri, Italy   15-06-20 July?? Test flight For 322 squadron
LRIP 12 12 AN-12 F-012 Cameri, Italy   18-06-20 July?? Test flight For 322 squadron
LRIP 12 12 AN-13 F-013 Cameri, Italy     July/August?? Prod. line.  
LRIP 12 12 AN-14 F-014 Cameri, Italy     Q3-2020 Prod. line.  
LRIP 12 12 AN-15 F-015 Cameri, Italy     Q3-2020 Prod. line.  
LRIP 12 12 AN-16 F-016 Cameri, Italy     Q3/Q4-2020    
LRIP 12 12 AN-17 F-017 Cameri, Italy     Q4-2020    
LRIP 12 12 AN-18 F-018 Cameri, Italy     Q1-2021    
LRIP 13 13 AN-19 F-019 Cameri, Italy     Q1-2021    
LRIP 13 13 AN-20 F-020 Cameri, Italy     Q1/Q2-2021    
LRIP 13 13 AN-21 F-021 Cameri, Italy     Q1/Q2-2021    
LRIP 13 13 AN-22 F-022 Cameri, Italy     Q2-2021    
LRIP 13 13 AN-23 F-023 Cameri, Italy     Q2/Q3-2021    
LRIP 13 13 AN-24 F-024 Cameri, Italy     Q3-2021    
LRIP 13 13 AN-25 F-025 Cameri, Italy     Q3/Q4-2021    
LRIP 13 13 AN-26 F-026 Cameri, Italy     Q4-2021    
LRIP 14 14 AN-27 F-027 Cameri, Italy     2022    
LRIP 14 14 AN-28 F-028 Cameri, Italy     2022    
LRIP 14 14 AN-29 F-029 Cameri, Italy     2022    
LRIP 14 14 AN-30 F-030 Cameri, Italy     2022    
LRIP 14 14 AN-31 F-031 Cameri, Italy     2022    
LRIP 14 14 AN-32 F-032 Cameri, Italy     2022    
LRIP 14 14 AN-33 F-033 Cameri, Italy     2022    
LRIP 14 14 AN-34 F-034 Cameri, Italy     2022    
FRP 15 15 AN-35 F-035 Cameri, Italy     2023    
FRP 15 15 AN-36 F-036 Cameri, Italy     2023    
FRP 15 15 AN-37 F-037 Cameri, Italy     2023    
FRP ?? ?? AN-38 F-038 Cameri, Italy     ??    
FRP ?? ?? AN-39 F-039 Cameri, Italy     ??    
FRP ?? ?? AN-40 F-040 Cameri, Italy     ??    
FRP ?? ?? AN-41 F-041 Cameri, Italy     ??    
FRP ?? ?? AN-42 F-042 Cameri, Italy     ??    
FRP ?? ?? AN-43 F-043 Cameri, Italy     ??    
FRP ?? ?? AN-44 F-044 Cameri, Italy     ??    
FRP ?? ?? AN-45 F-045 Cameri, Italy     ??    
FRP ?? ?? AN-46 F-046 Cameri, Italy     ??    
FRP ?? ??                
FRP ?? ??                
FRP ?? ??                
FRP ?? ??                
FRP ?? ??                
FRP ?? ??                
                   
Ordered   10 LRIP: 3, 4, 11.          
Contracted 27 LRIP: 12 - 15. Contract signed, US DoD to award the production contract to Lockheed Martin.
Total   37  
To be contracted 9 LRIP: unknown. Contract to be signed. Aircraft will be assigned to a third squadron.
Total   46  
Opport. 6 The MoD planned to purchase an additional 15 F-35A's. 9 of these are included in the budget for 2020.
Total   52  
   
Prod. Batch Production batch (FRP or LRIP).  
Prod. Lot Production lot.   
MSN /CN Manufacturer Serial Number.  
Prod. Plant Production plant.  
LRIP Low Rate Initial Production.  
FRP Full Rate Production.  
                   
 
Comment(s):

The corona crisis in Europe affected the delivery schedule. Aircraft F-011 and F-012 should have been delivered in the second quarter of 2020 (May or June).

F-011 and F-012: made their first test flight in the week of June 15. Delivery of an F-35 is made 1 to 1,5 month after their first flight.
F-013 was originally scheduled to be delivered in the second quarter. It has yet to make it first flight.
F-014 and beyond the original delivery schedule is maintained.